Projects

  • Crownfield Juniors Primary School
    Client: London Borough of HaveringSite: Crownfield Juniors Primary SchoolProject Duration: June 2019- ongoing Project Details:Five classroom extension with studio, toilets and office areas. Playground extension. Canopies for outdoor areas.
  • Brady Primary School
    Client: London Borough of HaveringSite: Brady Primary SchoolProject Duration: July 2019- ongoing Project Details:Eight classroom extension with offices, toilets and studio. Complete refurb of existing school which included extensive external works- playground extension, canopies, soft play areas and 3G multi-use games area. Car park and pedestrian areas created.
  • Newton’s Primary School
    Client: London Borough of HaveringSite: Newton’s Primary SchoolProject Duration: March 2015 – Dec 2015 Project Details:Design and construct an infill extension of 2 classrooms and administration offices linking the infants and primary school. Also included was complete refurbishment of the existing junior block which was completed during the summer break, ready for the schools return.
  • Gidea Park Primary School
    Client: London Borough of HaveringSite: Gidea Park Primary SchoolProject Duration: July 2016 – Dec 2016 Project Details:Design and construct multiple kitchen extension with complete kitchen refit. Works also included larges three tiered retaining wall and car park extension.
  • Crownfield Infants and Nursery
    Client: London Borough of HaveringSite: Crownfield Infants and NurseryProject Duration: July 2017 – April 2018 Project Details:Design and construct extension to nursery, including extensive adaptations to existing building throughout. Design and construct standalone KS1 building consisting of four classrooms and a hall with toilets and staff office area. The hall roof is a mono‐pitched metal… Read more: Crownfield Infants and Nursery
  • Scotts Primary School
    Client: London Borough of HaveringSite: Scotts Primary SchoolProject Duration: March 2015 – Dec 2015 Project Details:Design and construct an eight classroom standalone building plus extensive adaptations to internal areas including a kitchen extension and refit. External works included new playground and car par extensions.
  • Harold Wood Primary School
    Client: London Borough of HaveringSite: Harold Wood Primary SchoolProject Duration: 2013 ‐ 2016 Project Details:Design and construct multiple new classrooms and complete extensive adaptations / refurbishment works throughout the school to enable school expansion to three form entry. Also included was an extension to the school kitchen including refit of new equipment. External works included… Read more: Harold Wood Primary School
  • Towers Infants School
    Client: London Borough of HaveringSite: Various Works at Towers Infants SchoolProject Duration: May 2013 – Oct 2017 Project Details:Design and construct a two classroom plus shared teaching are extension to the infants, two infill extensions and an extension forming an entire nursery with teaching area, quiet room, staff kitchen toilets and changing facilities. Also completed… Read more: Towers Infants School
  • Rainham Village Primary School
    Client: London Borough of HaveringSite: Rainham Village Primary SchoolProject Duration: May 2018 – July 2019 Project Details:Design and construct a Nursery and four classroom extension comprising of double mono‐pitched, metal cladded roof along with flat roof. The standalone build also contained activity room, cot room and staff kitchenette along with toilet facilities. To accommodate the… Read more: Rainham Village Primary School